JS Special PatchFire Reactivity Special Health HIMS Hazard Ratings 0 - Least 1 - Slight 2 - Moderate 3 - High 4 - Extreme 624 S. Missouri, Indianapolis, IN 46225 ph: 317.684.7474 fx ...
jobsitesupply.com/js_datasheets/js_special_patch_1.pdf
DOWNLOAD
| Find Similar
advertisement
Text Previews (text result may be not accurate) Hazard Ratings
624 S. Missouri, Indianapolis, IN 46225 ph: 317.684.7474 fx: 317.684.7484
www.jobsitesupply.com
PRODUCT
ESCRI
TION
JS Special Patch is a two-component, cement based, latex-modi
fied repair mortar, specifically designed to provide fast and durable
ramps, driveways, garage or warehouse floors, bridge decks, park
ing structures.
NSTRUCTIONS
OR USE
Surface Preparation
General Traffic Surface Repairs:
Saw-cut the repair area edges
area to provide minimum depth. If reinforcement is exposed, clean
ing. Bonding substrate should be clean, sound and moderately
rough prior to repairing.
Repairs:
Saw-cut repair area edges to partial, minimum depth, but
avoid cutting reinforcement. Remove loose, unsound or contami
exposed reinforcement. Clean all corrosion products off exposed
reinforcement by sand blasting or power wire brushing.
and allow surface water to evaporate leaving a dry surface (SSD)
immediately prior to installing JS Special Patch.
Mixing:
Pre-mix latex component prior to use. Before starting
mixer, place JS Special Patch into mixer in the required proportions
(7 pints of copolymer latex to 50 lb of powder). Start the mixer
and slowly add the pre-blended dry JS Special Patch mortar into
the mixer. Continue mixing for 1-2 minutes as necessary or until
mixture is uniform and lump-free. Scrape down mixer sides as
necessary. Do not mix for more than 3 minutes.
Aggregate Extension:
Use pea gravel/rock extension for all appli
cations over 2 in thickness to reduce exotherm. Use a good qual
Aggregates should be added only after mortar and latex is well
mixed, then the mixing should be continued until the aggregate
blends in evenly.
Note:
aggregate extension may diminish workability. Reduce
aggregate quantity per batch if workability is not satisfactory for
placement conditions.
Working time is approximately 30 minutes @ 70ºF (21ºC). Both hot
also be used where desired.
Application:
Place by filling area slightly overfull, then consolidate by
strike-off surface with a straight edge. Delay final finishing until the
slightly, then to shave surface down and texture as necessary using the
lymer to surface of repair to increase wear resistance and durability.
Clean-up:
Tools and mixer can be cleaned with water before mixed
Shelf Life:
When stored in a controlled environment in accordance
to Jobsite Supplyrecommendations and left in its original unopened
characteristics for 12 months from date of manufacture.
Storage:
Keep from freezing, do not store in temperature above
120ºF.
IMITATIONS/
ARNIN
Contains hydraulic cement, calcium sulface, crystalline silica and
other additives. Avoid breathing dust. Jobsite Supply recommends
protection) when working with this product. Avoid eye contact or
prolonged contact with skin. If eye contact occurs, wash immediately
Wash affected skin areas with soap and water. Do not use for under
NICAL
ERVICES
uct and technical support.
PAC
50 lb bag and one-gallon jug
of co-polymer
60 lb pail unit